Billing Rates / Tap Fee / Service Charge Increases Effective January 1, 2025
December 19, 2024
Tier (gal.): Residential, Commercial & Multi-User
0-2,000 $2.90 per 1,000
2001-6,000 $3.10 per 1,000
6,001+ $3.30 per 1,000
Residential Base Rate: $13.00
Commercial & Multi-User Base Rate: $13.00 1st REU + $6.50 for every additional REU.
Residential Equivalent Unit (REU) = 8,000 gallons per month
Meter Fees
Impact Fee Per REU $1,000.00
Dig In Tap:
¾” $2,000.00
1” $2,700.00
1.5” $4,000.00
2” $6,000.00
Drop In Tap:
¾” $1500.00
1” and Over Actual Costs + Labor
Sewer Meter $400.00
Pavement Cut $600.00
Meter Relocation $400.00
(Less than 8 feet with no obstruction)
Meter Relocation Actual Costs + Labor
(Greater than 8 feet or with obstruction)
New Service (Meter in Place)
Security Deposit $100.00
Service Charge $50.00
Total to connect water service is $150.00. This includes the deposit and service charge. A security deposit is required of every customer except when meter fees are paid.
Construction Water Use Rates
Security Deposit: $1500.00
Service / Inspection Fees: $500.00
Meter Size / Monthly Base Rate:
6” $350.00
8” $550.00
10” $750.00
12” $1050.00
Water Volume: $5.00 per 1,000
Late Fees & Other Fees
Bills paid after the 25th of the month $5.00 or 10% of the total bill, whichever is greater.
Reconnection Fee – Business Hours $50.00
Reconnection Fee – After Hours $100.00
Return Payments $35.00
Meter Tampering / Obstruction Fee $150.00
Service Diagnostic Fee $50.00
New Development Admin Fee $1500.00
Credit Card Processing Fee $.75 up to $30.00 and 4% for $30.01+
Temporary Cleaning $50.00 (2 Weeks)
Damaged Facilities Replacement Costs (Parts & Labor) plus Service Diagnostic Fee
Hydrant Installation Actual Cost + Labor
Flow Test $200.00